Penalty Rules of ACC

Anchor Perfect 10

Sportobuddy will be continuously be in touch with the umpires to make sure the innings are completed within 35/40 minutes for each innings. The decision of whether the team has caused the delay or not will be decided solely by the umpires present on the field.
In case of slow over rate the Umpires will take a final call on whether there was any interference by the batting team which caused the bowling team to delay their completion of 10 overs

1st Innings Penalty

The bowling team needs to complete the allotted 10 overs even if they cross the allotted time limit. In this case, the team batting second will face a penalty of the extra time taken to complete their allotted 10 overs as follows:

4 extra mins = 1 over penalty
e.g. Team bowling first takes 44 minutes to complete 10 overs. Here, they will get to bat 1 over less i.e. 9 overs to chase the target.

2nd Innings Penalty:

Second innings will stop at the time allotted for that innings and accordingly penalty will be applied to the bowling team. Penalty for slow over rate will be average run scored in the inning + 10 runs for every over bowled short.

e.g. Team bowling second finishes 9 overs in allotted time. In this case, the innings will stop and the batting team will get penalty runs as follows
Penalty Runs Calculation is Average runs scored by the team batting second + 10 runs per over.

 

Anchor Premier League

Sportobuddy will be continuously be in touch with the umpires to make sure the innings are completed within 85/90 minutes for each innings. The decision of whether the team has caused the delay or not will be decided solely by the umpires present on the field.
In case of slow over rate the Umpires will take a final call on whether there was any interference by the batting team which caused the bowling team to delay their completion of 20 overs

1st Innings Penalty

The bowling team needs to complete the allotted 20 overs even if they cross the allotted time limit. In this case, the team batting second will face a penalty of the extra time taken to complete their allotted 20 overs as follows:

4 extra mins = 1 over penalty
e.g. Team bowling first takes 99 minutes to complete 20 overs. Here, they will get to bat 1 over less i.e. 19 overs to chase the target.

2nd Innings Penalty:

Second innings will stop at the time allotted for that innings and accordingly penalty will be applied to the bowling team. Penalty for slow over rate will be average run scored in the inning + 10 runs for every over bowled short.

e.g. Team bowling second finishes 19 overs in allotted time. In this case, the innings will stop and the batting team will get penalty runs as follows
Penalty Runs Calculation is Average runs scored by the team batting second + 10 runs per over.

 

My Father My Anchor

Sportobuddy will be continuously be in touch with the umpires to make sure the innings are completed within 85/90 minutes for each innings. The decision of whether the team has caused the delay or not will be decided solely by the umpires present on the field.
In case of slow over rate the Umpires will take a final call on whether there was any interference by the batting team which caused the bowling team to delay their completion of 20 overs.

1st Innings Penalty

The bowling team needs to complete the allotted 20 overs even if they cross the allotted time limit. In this case, the team batting second will face a penalty of the extra time taken to complete their allotted 20 overs as follows:

4 extra mins = 1 over penalty
e.g. Team bowling first takes 99 minutes to complete 20 overs. Here, they will get to bat 1 over less i.e. 19 overs to chase the target.

2nd Innings Penalty:

Second innings will stop at the time allotted for that innings and accordingly penalty will be applied to the bowling team. Penalty for slow over rate will be average run scored in the inning + 10 runs for every over bowled short.

e.g. Team bowling second finishes 19 overs in allotted time. In this case, the innings will stop and the batting team will get penalty runs as follows
Penalty Runs Calculation is Average runs scored by the team batting second + 10 runs per over.

 

Anchor International Champions Trophy

Sportobuddy will be continuously be in touch with the umpires to make sure the innings are completed within 85/90 minutes for each innings. The decision of whether the team has caused the delay or not will be decided solely by the umpires present on the field.
In case of slow over rate the Umpires will take a final call on whether there was any interference by the batting team which caused the bowling team to delay their completion of 20 overs

1st Innings Penalty

The bowling team needs to complete the allotted 20 overs even if they cross the allotted time limit. In this case, the team batting second will face a penalty of the extra time taken to complete their allotted 20 overs as follows:

4 extra mins = 1 over penalty
e.g. Team bowling first takes 99 minutes to complete 20 overs. Here, they will get to bat 1 over less i.e. 19 overs to chase the target.

2nd Innings Penalty:

Second innings will stop at the time allotted for that innings and accordingly penalty will be applied to the bowling team. Penalty for slow over rate will be average run scored in the inning + 10 runs for every over bowled short.

e.g. Team bowling second finishes 19 overs in allotted time. In this case, the innings will stop and the batting team will get penalty runs as follows
Penalty Runs Calculation is Average runs scored by the team batting second + 10 runs per over.